CASALE PROJECT a.s.
Our company carried out the design, production, packaging and supervision of the installation of the CTFRP 200 / IV cooling tower in a chemical plant in Uzbekistan.
Technical parameters
Flow rate: 9000 m³ / h Inlet temperature: 33 ° C
Cooling capacity: 83.142 MW Output temperature: 25 ° C
The construction of this cooling tower is completely made of FRP (fiber-reinforced plastic) material.
It is a composite skeleton structure of the tower connected by stainless steel connecting material.
The type of construction is light, strong, chemical resistant.